Hi Tomas,
Are these set of tables won't ever require to be part of CRR? I understood if I put them in exclusion list of tables they won't be part of CRR and will be taken care during Downtime.
Please elaborate
Regards
Chandra
Hi Tomas,
Are these set of tables won't ever require to be part of CRR? I understood if I put them in exclusion list of tables they won't be part of CRR and will be taken care during Downtime.
Please elaborate
Regards
Chandra
Hi Guys,
I do encounter the same error and in order to resolve the error please see below.
If you migrate data from BPC 10 to 10.1 without first activating the UJT_MIGRATE_100_TO_101.
a. Close the EPM-Add IN in Excel .
b. Delete the Environment restored on the BPC 10.1 (using Manage Environment), then re-restore (using UJBR).
c. Once restored, run UJT_MIGRATE_100_TO_101, then you can now open the BPC for web interface and EPM Add-In in Excel.
Hope it helps.
Regards,
Mitch
Hi,
Have you tried to remove first the Item Group column then upload it after everything has been uploaded?
Regards
Hello Rachel,
Yes this perform goods movement and confirmation cancellation both. You can try with SE37 and put there test sequence with BAPI_PRODORDCONF_CANCEL & BAPI_TRANSACTION_COMMIT. Now run and check the result.
Regards,
Dear Experts,
Error is resolved.
Thanks a ton for you kind support
Ritu
Hi Avinash,
Thanks for your valuable information and appreciate for all your works.
I mistakenly mention its report level, I want hard code for Query Level Filter.
Once the report refresh it should prompt to End Date: Any Date Range
Start date based on End date of the month that particular month.
Kindly suggest me.
Thanks
Ram
Mohit,
in which module? and what tasks do you do?
what is your overall understanding in business processes of your company?
TW
Welcome
Dear Experts,
please help on step & codes in CMOD how to fetch system status from notification using FM : STATUS_TEXT_EDIT into 2LIS_17_I0NOTIF.
thanks,
midx
Sorry... What I mean is, spend more time on reading field by filed helps for the configuration step "
This is the key configuration step. If you do not know how EP works, then ask an HR Consultant to help you.
Hi Manish,
It return no result, even the SN is updated within the date range.
Anyway, I may need to clarify, even UDF_A/B is not updated, it may contain value.
Eg:
Before Update:
UDF_A = TEST1
UDF_B = TEST2
After Update:
UDF_A = TEST111 (no update)
UDF_B = TEST2 (update on March 15)
Thanks
Thanks,I solved.
Why not create a condition with statistical for the BP which do not pay?
Hi Owen,
Thanks for reply. My problem is that i am producing a semifinished material but not selling it and even it have no BOM & routing. Producing and capturing all its material cost and SMH cost in plan cost, then issuing it from Sloc. & settling its cost to cost center through 901 mvt. type.
Hence, when i am going to settle it then only the material cost is getting settle in the cost center. Also, please explain me that is it a standard scenario where always plan cost credit will considered material cost & SMH cost will considered as plan cost debit.
As per my study the calculation of plan cost credit & plan cost debit is as per below.
Plan Cost Credit = Actual qty. X Standard price
Plan Cost Debit = Plan qty. X SMH hour booked in routing X Activity rate
Please explain
Regards,
Samrat
I don't have 12.6 myself but some code I wrote was migrated by someone to 12.6 and it appears that PBMinorRevision is reported as zero instead of 6.
If this has been fixed, please let me know how they can update. I have no idea what build they have.
Thanks!
Hello Karun,
If the installation number is changed, I suggest you to restart SAP system and retry logon again.
Regards,
Ning Tong
Hi, Please help to suggest which media that I need for SolMan Installation, I already read Master Guide and Media List for SolMan 7.1 but I can't came up with what exactly media do I need to use for installation. I plan to install as central system which is Windows 2008 R2 and ORACLE Database. I follow this link (https://websmp107.sap-ag.de/swdc) then follow as this (Installations and Upgrades - S" SAP SOLUTION MANAGER" SAP SOLUTION MANAGER 7.1) then choose Installation->Windows->ORACLE Database then it's show a lot of media to use but I can't figure which I need. I want to install from scratch (not an update) and plan to have DB into SolMan separate from ERP. Thanks
Hi Saad,
For the error:
If It is working in dev system, then we have the issue in TR only. In prd system, Kindly check the nace configuration for the name of driver program and smartform name which is configured for the particular output type.
Kindly include those objects in the TR and move the TR to Quality & Production system.
Regards
Rajkumar Narasimman
Thank you
Hi Usman,
Are you importing the report in same region as your BI launch pad?
Remember you have to also import universe and connection everytime you import a report.
Thanks,
Swapnil